Home > Buy Now > Construction Material Making Machinery > Brick Making Machinery > Simple Concrete Blocks Production Line
 


Shanghai  7U Machinery Co., Ltd.
 
icon Products

line

icon Company Profile
icon Selling Leads

line

 
Contact us
Shanghai 7U Machinery Co., Ltd.
[China]
Address:
No.285, Tiangong Road, Jinshan Industrial Park, Jinshan District Shanghai Shanghai 201501 China
Phone:
86-021-37286052
Contact name:
David Guo , Vice General Manager
Inquire now










Shanghai 7U Machinery Co., Ltd.



 
Products

Simple Concrete Blocks Production Line

Inquire now

Simple Concrete Blocks Production Line

Click to enlarge image

 Origin China
 Model Number 7U-QT-SL
 Brand Name 7U Machine

Stage 1. raw material batching            Manual

-handle trolly        (2 sets), Carry sand, scree, cement etc. to mixer

Stage 2. concrete mixing              Mechanical

-concrete mixer           Prepare concrete for block making machine

Stage 3. block making                    Auto

-concrete belt conveyer              Carry concrete to storage hopper

-concrete storage hopper           Store concrete for block making machine

-7U-QT/M block making machine        Produce concrete blocks

-hydraulic station          provide strong oil pressure power for actions of block making machine

-pallet feeder                Provide pallet to block making machine

-block conveyer            Carry fresh blocks&pallet out from block making machine

Stage 4. block curing                    Manual

-wheel trolly         (about 3 sets) Carry blocks&pallet to curing area, then to block storage area

Stage 5. block cubing                 Manual

Stage 6. pallet returning              Manual

Control System                 1            PLC

It control the working condition of concrete belt conveyor, concrete storage hopper, hydraulic station, block making machine, block conveyer, movable stacker, and pallet feeder.

Curing Way           Natural Curing I

2 days at curing area, be kept moist by sprinkling with water, then be moved outside to block storage area for at least 25 days before selling

Workers Needed        12

2 for aggregates batching and put aggregates into hoisting hopper of mixer; 1 for mixer, water adding in, concrete discharging; 1 for block making, operating the control cabinet; 4 for moving block&pallets to trollies and bringing them to curing area; 3 for moving cured blocks to blockstorage area, cubing blocks and collecting pallets there; 1 for carrying pallets to block making machine.

 

Comparing with other production lines, this production line needs the lowest equipment investment, with machines bought from our company, customer can produce blocks and doesnt need to prepare any other equipments. The installation, commission and personnel training needs about 2 weeks.

All PLC controlling equipments and the mixer, and the 2 handle trollies and 3 wheel trollies will be provided by our company. Please contact by email 7umachine at gmail dot com.




Inquire now